*** SORRY - THIS PLANT HAS BEEN SOLD. PLEASE CONTACT US TO OBTAIN A QUOTATION FOR A NEW BUILD. ***

Currently we have one of our Explorer 30 trailer-mounted exploration/pilot plants fully assembled in our workshop. The Explorer 30 was developed for on site pilot DMS campaigns for base metals preconcentration or beneficiation of heavy minerals (e.g. iron ore), and bulk sampling of gemstones. We have previously supplied Explorer 30 plants to BHPB.

The plant has been trial assembled and water tested, and is now available for inspection and purchase or lease.


Features

The plant consists of a front-end with feed bin, feed conveyor, primary VGF, and a scrubber with a double-skin trommel. The second half of the trailer consists of a surge bin, weigh feeder and 10 tph DMS, with concentrate handling system. The motor control centre is mounted on the top floor of the DMS complete with a sheeted operator shelter.

The DMS is a standard Consulmet design complete with separating cyclone. Automatic density control is via a Debex unit. Tracer test sampling points are provided on the DMS. DMS concentrate is discharged into a secure sputnik system. DMS rejects are discharged onto a conveyor.

The plant is designed to be fed by a Front-End-Loader (client supplied) complete with load cells on the bucket to monitor feed tonnage.


Optional Extras

  • We can provide a comprehensive on-site installation supervision and dry and wet (hot and cold) commissioning service.
  • Full turnkey site installation.
  • Complete spares service.

Pricing

*** SORRY - THIS PLANT HAS BEEN SOLD. PLEASE CONTACT US TO OBTAIN A QUOTATION FOR A NEW BUILD. ***