Photo of Lanti Dry Mining

Overview

Lump sum turnkey design, supply and construction of a complete 500 tph mineral sands plant. The plant has been configured to handle 500 tph ROM feed, through two parallel streams of 250 tph per stream. The spirals module comprises a 5 stage spiral arrangement able to handle 300 tph. The plant includes a Motor Control Centre and PLC/SCADA control room, all associated electrics and plant transformer, including plant lighting and three mast or area lights. A 1,000m3 plant process water dam and plant process water pumps have been included at the Plant. A river pump station with a transformer has been provided for, including the pipeline for a distance of 1km from the plant.

Client

Sierra Rutile

Location

Sierra Leone

Year completed

2013

Flowsheet summary

2 x 250 tph dry front end feed, 300 tph five-stage spiral plant with pontoon mounted process water supply system.