Photo of ENRC Copper

Overview

Lump sum design, supply and construction of a 300 tph copper pre-concentrator.

Client

ENRC Comide

Location

Kolwezi, Democratic Republic of Congo

Year completed

2013

Flowsheet summary

Single stage spirals circuit with capacity flexibility from 100 to 300 tph. The plant includes a hydrosorter.

Share this

Consulmet copper preconcentrators